|
|
![]() |
|
Minutes after setting the pier on the foundation (80 lbs of concrete, 2 ft down). Note that the pier is bolted to the foundation. It can be easily removed if needed. |
Image | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | |
Camera: MINOLTA CO.,LTD DiMAGE X | Date: 9/17/07 6:31 PM | Resolution: 380 x 507 | ISO: 200 | Exp. Time: 1/417s | Aperture: 2.8 | Focal Length: 6.0mm | Caption: MINOLTA DIGITAL CAMERA |
Total images: 16 | Last update: 7/23/08 10:11 PM | Help |